Go Back To Homepage

Telephone: 01246 470005
Fax: 01246 470006
E-mail: sales@seaotterboats.co.uk

Our Testing Tank

Sea Otter Testing Tank

Welcome to the Sea Otter testing tank. Boats are put onto the testing tank at various stages of the construction. The boats are then completely fitted out in unit 1 before being tested on the testing tank for a second time. This testing ensurse that the boat is trimmed properly and if not it is corrected by adding the appropriate weights. From the testing pond the boats are then taken into the painting shop in unit 2. The boats are then tested for the third and final time in the testing tank. This is a final test for the boat where everything is tested including running the engine. If you wish to go to the other end of the testing tank and look across unit 2 from the end of the tank then click the end of the tank.

To go back to the front of unit 1 click here.

A Dutch Barge Shell Being Lowered Into The Testing Tank

An aluminium Dutch Barge shell about to be lowered into the testing tank.

A Narrowboat In The Testing Tank

A completed narrowboat being tested for the final time before being dispatched.

A Dutch Barge In The Testing Tank

A completed Dutch Barge being tested for the final time before being dispatched.
Go Back To Start Of Tour